PROJECT AUTHORIZATION PACKET ID: PMT-BFEB
CONTRACT ID EMARS PROGRAM CODE AUTHORIZATION NO:
8580703D 8580702D     85807 2
It is hereby ordered that the project herein described be undertaken and accomplished within the funding level authorized.
PROJECT ID PROJECT ID NUMBER FEDERAL PROJECT NUMBER 6 YR PLAN ITEM NUMBER 6 YR PLAN ITEM PARENT NUMBER
004 005 1 007-009

NHPPBR0601204

01-01140 99-01073.01-
PROJECT TYPE PROJECT LENGTH NUMBER OF BRIDGES SYSTEMS
BRIDGE REPLACEMENT MI
PROJECT PHASE
&
RESPONSIBILITY
PLANNING DESIGN RIGHT OF WAY UTILITIES
CONSULT
CONSTRUCTION TITLE DEEDED TO: MAINTENANCE OTHER
FUNDING & TIME
ACCOUNTABILITY
PARTICIPATING AGENCIES
FEDERAL FHWA STATE DOH LOCAL OTHER IDOT
REQUESTED FUNDS FOR THIS AUTHORIZATION
ITEM NUMBER PHASE FUND PROGRAM FEDERAL FISCAL YEAR STATE FISCAL YEAR
FEDERAL APPR
CODE
CURRENT FUNDING REQUEST
1-1140.01 D 1200 FD52 2021 2021 Z001 $2,900,000.00
1-1140.01 D 1300 FD52 2021 2021 Z001 $3,625,000.00
1-1140.01 D 1100 FD52 2021 2021 Z001 $725,000.00
CURRENT FUNDING REQUEST TOTAL: $7,250,000.00
AUTHORIZATION SUMMARY FOR THIS 10-1 SERIES
PHASE TOTAL AUTHORIZATION TO DATE (INCL. CURRENT REQUEST)
PLANNING $0.00
DESIGN $10,250,000.00
UTILITIES $0.00
R/W $0.00
CONSTRUCTION $0.00
NON-HIGHWAYS $0.00
  Total: $10,250,000.00
REMARKS: THIS MODIFICATION PROVIDES ADDITIONAL $7,250,000 FD52 NHPP FUNDS FOR PE AND ENVIRONMENTAL. HALF OF THE PROJECT COSTS ARE TO BE REIMBURSED BY THE STATE OF ILLINOIS.
 
Project Approval Recommended By:
James Ballinger   11/5/2020
Signed and Approved by:
Jim Gray   11/6/2020
AUTHORIZATION LOCATION
ITEM NO. COUNTY DIST FACILITY NAME
ROUTE LENGTH SCOPE
01-01140.01 BALLARD


1 CAIRO BRIDGE US 51 MI PE AND ENVIRONMENTAL FOR REPLACEMENT OF CAIRO BRIDGE AT OR BESIDE EXISTING LOCATION.